Count the decisions behind one connector callout and you get somewhere near a dozen. Series and insert arrangement. Contact size, plating and supply form. Wire slash sheet, conductor coating, temperature. Crimp tool, positioner, selector setting, gage interval. Backshell angle, strain relief, where the shield lands. Acceptance standard and sample size. Then the ones nobody thinks of as engineering at all: who may approve an alternate, and how long the certificates have to exist.
Now count what a typical drawing records. Four, perhaps five. The rest lives in somebody's head, in a shop convention, or in the habits of whoever built the last one, and all three of those leave the company eventually.
A connector callout is the part of the drawing that survives that. Everything below is a decision argued out somewhere in this Knowledge Center over the past seven months, collected into one list, with the post that settled each one. If you already know your part numbers and simply want them priced, the quote form takes a part number, a quantity and a date.
What Belongs on an Interconnect Callout?
Every parameter somebody downstream would otherwise have to guess. Connector and contacts by full part number. Wire by slash sheet and temperature. Crimp tooling by tool, positioner and setting. Acceptance standard with its sample size. Sealing architecture and the mounting it assumes. Plus a line naming who may change any of it.
That last one is the test of whether a drawing is finished. Parts are easy to specify and authority is not, so authority is what gets left out. What interconnect solutions actually include is broader than most callouts admit, and the gap between the two is where rework lives.
The Connector: Series, Insert, Contacts, Finish
Write the connector out in full, including the finish code, and resist the urge to abbreviate it to something the stores system will accept.
MIL-DTL-38999 is active, dated 27 July 2026 on its DLA ASSIST record. It covers four series of circular connector capable of operating between -65 °C and +200 °C. Four series under one specification number is the trap: a drawing that says "38999 connector, 26 way" has named a family, not a part. Which series you need changes the coupling, the shell depth and the panel cut-out, and none of those is recoverable at build.
Contact plating belongs on the callout rather than in the contact supplier's default. Gold and tin behave differently under low-level signals and repeated mating, and a connector that is mated once in its life has different requirements from one a technician unplugs monthly. Plating choice is a decision, so record it as one.
Shell material and finish hide inside the same part number and deserve a sentence of their own on the drawing, because they are the fields most likely to be quietly swapped for availability. Aluminium with an electroless nickel finish, aluminium with cadmium, stainless, composite: these are not interchangeable in salt spray, in weight budgets, or in grounding paths, and the finish code is a single character that carries all of it.
Leave it off and: stores substitute a different shell finish, or a crimp contact arrives gold-flashed when the design assumed tin. Both pass incoming inspection. Neither is the part you designed.
The Wire: Slash Sheet, Coating, Temperature
Two digits carry most of the wire specification, and most drawings print only the base number.
SAE AS22759, revised as AS22759E in July 2024 by the AE-8D Wire and Cable Committee, covers fluoropolymer-insulated single conductor wire with tin-coated, silver-coated or nickel-coated conductors of copper or copper alloy, with the coating set by the applicable detail specification. Which is to say the slash sheet, not the base number, decides what you get. Reading an M22759 part number properly is not optional detail; the same base designation spans a fifty-degree range of temperature ratings and two different storage regimes.
Put the temperature you are relying on next to the slash sheet in plain numbers. The person reading the drawing in six years will not reconstruct it from the designation, and the wire and cable they order against it will be whatever matches the digits that are printed.
Leave it off and: a silver-coated conductor rated 150 °C gets ordered against a design that assumed 200 °C, and nothing reveals the error until a thermal survey or a failure.
The Crimp: Tool, Positioner, Setting, Gage
Here is a callout line that has quietly gone stale on a great many drawings.
The crimp tool specification moved. MIL-DTL-22520/40 was cancelled on 29 April 2013 and superseded by SAE AS22520/40, and the base specification now sits with SAE as AS22520, reaffirmed in February 2018 by the AE-8C2 Terminating Devices and Tooling Committee. Drawings across the industry still say M22520, exactly as they still say M22759, because the part marking persists long after the governing document has moved out from under it.
Read the scope of AS22520 and you find something more useful than a renaming. It covers crimping tools, accessories and inspection gages in the same specification. Gage and tool are one system, which is why naming the tool without the gage interval leaves half the specification unused. Tool, positioner and selector setting belong next to the contact part number, because the positioner decides where along the barrel the indents fall and the setting decides how far they go.
Leave it off and: a technician fits the positioner that is already in the frame. The crimp passes a pull test, because pull tests pass almost everything, and fails in service four years later.
The Termination: Backshell, Strain Relief, Shield
SAE AS85049, revised April 2021 and issued August 1998 by the AE-8C1 Connectors Committee, covers connector accessories for environmental and non-environmental use, with the accessories defined in it delineated for suppression of electromagnetic and radio frequency interference. Accessories, not afterthoughts.
A backshell callout needs the angle, the cable entry size, the strain relief type and the shield termination method. Those are four independent choices and drawings routinely record one of them. Backshell selection has more variables than the connector it attaches to, and the shield termination in particular is a decision about grounding rather than mechanics.
Say how the braid lands. A band around the backshell adapter, a solder sleeve, a pigtail to a dedicated pin: each gives a different transfer impedance and a different serviceability, and a drawing that shows a shielded cable entering a backshell without saying which one has left the decision to a bench. Where the braid terminates also sets where the shield current goes, so it is the same drawing note that decides whether the screen is doing anything at high frequency.
Leave it off and: the harness is built with a straight backshell where a 90° was intended, the cable bends immediately at the entry, and the strain relief transfers load into the contacts it was fitted to protect.
The Acceptance Standard and the Sample Size
Naming a standard is half a specification. The sample size is the other half.
A drawing that says "workmanship to IPC/WHMA-A-620" has told the inspector which document to open and nothing about how many of the fifty harnesses in the batch get destructively pull tested, or what happens to the batch when one fails. Those numbers differ between the commercial standard and the two space-sector ones, and which acceptance criteria apply to your build is a contractual question before it is a technical one.
Write the standard, its revision, the test method, the sample size and the disposition rule. Five short entries. They are the difference between an inspector making a judgement and an inspector applying a decision you already made.
Revision matters more than people expect on this line. Acceptance documents get reissued with changed tables, so a drawing citing a base number inherits whichever edition the inspector happens to hold. Name the revision and the argument stops.
Leave it off and: two batches built on the same bench against the same drawing get different answers at incoming inspection, and nobody can say which one was right.
The Sealed Boundary and the Ingress Rating
IEC 60529 is titled Degrees of protection provided by enclosures, and it classifies protection provided by enclosures for electrical equipment rated up to 72,5 kV. Enclosures. The rating is a property of the assembled thing, not of a component bought across a counter, which means an IP number written next to a connector part number is describing a test the connector passed in somebody else's panel.
So the callout needs the mounting as well as the rating: panel thickness, cut-out tolerance, O-ring and torque. Where the sealed boundary belongs is an architectural decision taken early, and the IP rating you actually need follows from it rather than the other way round.
There is a second half to this line that drawings almost never carry: whether the rating applies mated, unmated, or both. A circular connector left unmated on a mast is a hole, and the dust cap that closes it is a separate part number nobody ordered.
Leave it off and: the connector is fitted into a hole cut to a workshop tolerance, and the assembly carries a rating nothing on it was tested to.
Four Lines About Procurement That Belong on the Drawing
These are the lines engineers consider somebody else's problem, and they are the ones that stop a build.
Who may approve an alternate. Not whether an alternate exists, but whose signature makes it acceptable. Approval authority sits with the party that owns the design, and the time to record that is while the drawing is being written rather than during the shortage.
What traceability is required. Certificate of conformity, test report, country of origin, retention period. What provenance evidence actually proves varies enormously between a certificate and a traceable record, and the drawing is where you state which one you want.
Which source channel is acceptable. Franchised only, or independent distribution permitted when the authorized channel cannot supply. That is a procurement rule with engineering consequences, and how to evaluate a supplier against published documents is the groundwork behind it.
Whether the part is end-of-life. A date on the drawing beats a discovery in year three. If a last-time-buy has been announced, the drawing is where that belongs, because it is the document the next programme reads when it reuses your design. Obsolescence arrives as a sourcing problem and becomes an engineering problem the moment the alternate needs approval, so the two lines above and this one are really one decision written three times.
Two Decisions This Series Has Not Settled
The list above is as complete as this Knowledge Center currently makes it, which is not the same as complete. Two callout lines have no post behind them, and pretending otherwise would make the checklist convenient rather than useful.
Environmental qualification. RTCA's own page describes DO-160 as Environmental Conditions and Test Procedures for Airborne Equipment, with DO-160G the current version published in 2010 and referenced by FAA Advisory Circular AC 21-16G. A drawing that names it still has to say which sections apply, at which category, and whether qualification by similarity is accepted. Nothing in this series tells you how to make that call.
EMI performance. MIL-STD-461 is active at Revision H, dated 17 April 2026 and superseding Revision G of December 2015. Seven months is not long enough for a revision to reach most drawings, which is precisely the problem: a callout naming Revision F or G is now naming a superseded document, and the limits and test methods it points at have moved. We have written about shielding hardware and not about specifying shielding performance.
Both are on the list to write. Until they are, treat those two lines as ones your own qualification engineer owns.
The Callout, As One Block
Copy this. It is the article in a form you can paste into a drawing note or a specification template, and it is deliberately written as entries rather than prose so that each line either has a value after it or visibly does not.
| Line | What to write | Settled in |
|---|---|---|
| Connector | Full part number including finish code and insert arrangement | 38999 series guide |
| Contacts | Size, plating, supply form, quantity per connector | Gold vs tin |
| Wire | Base specification, slash sheet, gauge, conductor coating, temperature rating in °C | M22759 callout |
| Crimp tool | Tool part number, positioner part number, selector setting | Crimp tooling |
| Gage | Gage part number and verification interval | Crimp tooling |
| Backshell | Part number, angle, entry size, strain relief type, shield termination method | Backshells |
| Acceptance | Standard, revision, test method, sample size, disposition rule | Acceptance criteria |
| Sealing | Panel thickness, cut-out tolerance, sealing element, torque, resulting IP rating | Cable gland vs connector |
| Alternates | Named approval authority and the change process reference | Substitution approval |
| Traceability | Documents required and retention period in years | Component traceability |
| Source | Franchised only, or conditions under which independent supply is accepted | Supplier selection |
| Obsolescence | Last-time-buy date if known | Not yet covered here |
| Environmental | Qualification document, sections, category | No post yet |
| EMI | Standard and revision, limits, test method | No post yet |
Fourteen lines. Most drawings carry five of them, and a D38999/26FJ4SE on a drawing with the other thirteen filled in is a different object from the same part number on a drawing without them.
What Makes a Callout Review Answerable
A vehicle electronics retrofit crossed our desk with a callout that was entirely correct when it was drawn. It named M22520 tooling, MIL-STD-461F for EMI and a wire slash sheet that had been superseded. Nothing was wrong with the engineering. The drawing had simply aged, and three of its references now pointed at documents that had been cancelled or revised underneath it.
That is the honest difficulty with this whole subject: a callout decays without anyone touching it, and the decay is invisible from inside the drawing. Checking it means opening a dozen records on different registries. If you would rather not spend the afternoon, send the connector and wire callouts from one drawing, the target delivery date and the application, and our design support engineers will come back with which references have moved and what the current designations are. One drawing is enough to see whether the answer is useful.
You do not need a part number to start. A photograph of the existing drawing block, a scan, or a competitor's part number is enough to work from, which matters when the drawing you are worried about is the one you inherited. Reviewing it before production is also considerably cheaper than discovering the problem at first article, which is the argument engineering support has always made.
What we cannot do is tell you whether your customer will accept the alternate. That signature is not ours and no distributor can supply it.
Frequently Asked Questions
What should a connector callout include on a drawing?
The connector by full part number with finish code, contact size and plating, the wire by slash sheet and temperature, the crimp tool, positioner and selector setting, the backshell and shield termination, and the acceptance standard with its sample size. Add the approval authority for alternates and the traceability documents required.
Is M22520 still the correct crimp tool specification?
Not as a current document. MIL-DTL-22520/40 was cancelled on 29 April 2013 and superseded by SAE AS22520/40, with the base specification now published as SAE AS22520, reaffirmed February 2018. The M22520 marking persists on tools and drawings, so order against the SAE designation and check the slash sheet.
Why does an IP rating on a connector not transfer to my assembly?
Because IEC 60529 classifies degrees of protection provided by enclosures rather than by individual components. The connector reached that rating in a specified mounting, with a defined panel thickness, cut-out and torque. Reproduce those and the assembly can meet it; change the panel and the number describes a test your assembly never had.
How much detail about crimp tooling belongs on the drawing?
Tool part number, positioner part number, selector setting and gage verification interval. SAE AS22520 covers tools, accessories and inspection gages together, so specifying the tool without the gage interval uses half the document. Four short entries remove the single most common source of undocumented variation in a harness.
Which acceptance standard should the drawing name?
Whichever one the contract flows down, named with its revision rather than its base number. Then add the test method, the sample size and what happens to the batch if a sample fails. A standard without those three is an instruction to the inspector to decide, which is the thing a drawing exists to prevent.
How often should an existing callout be rechecked?
Whenever a programme is revived, requalified or moved to a new build partner. Specifications migrate between issuing bodies and revisions supersede quietly, so a callout that was right at release can point at cancelled documents a decade later without a single character changing on the drawing.
The Drawing Outlives Everyone Who Argued About It
The engineer who chose the series moves on. Your buyer retires. A contract manufacturer changes, and the technician who knew which positioner to fit takes that knowledge to another job. What remains is a drawing, and it is read by people who were not in any of those conversations.
Most specification effort goes into getting the decisions right, which is the easy half, and very little goes into writing them down, which is the half that lasts. Every line in the block above exists because somebody once left it off and paid for it.
A callout is not paperwork about engineering. It is the engineering, in the only form that survives the project.
Sources
The technical figures in this article come from the following documents.
- Defense Logistics Agency. MIL-DTL-38999, Connectors, Electrical, Circular, Miniature, High Density, Quick Disconnect, Environment Resistant, active, document date 27 July 2026. Accessed 16 November 2026.
- Defense Logistics Agency. MIL-DTL-22520/40, Crimping Tools, Terminal, Hand, Wire Termination, cancelled 29 April 2013, superseded by SAE-AS22520/40. Accessed 16 November 2026.
- SAE International. Crimping Tools, Wire Termination, General Specification For, AS22520, reaffirmed February 2018. Paid standard, available from SAE International. Accessed 16 November 2026.
- SAE International. Connector Accessories, Electrical General Specification For, AS85049, revised April 2021, issued August 1998. Paid standard, available from SAE International. Accessed 16 November 2026.
- SAE International. Wire, Electrical, Fluoropolymer-Insulated, Copper or Copper Alloy, AS22759E, revised July 2024. Paid standard, available from SAE International. Accessed 16 November 2026.
- Defense Logistics Agency. MIL-STD-461, Requirements for the Control of Electromagnetic Interference Characteristics of Subsystems and Equipment, active at Revision H, document date 17 April 2026. Accessed 16 November 2026.
- RTCA. DO-160, Environmental Conditions and Test Procedures for Airborne Equipment, current version DO-160G published 2010. Accessed 16 November 2026.
- International Electrotechnical Commission. Degrees of protection provided by enclosures (IP Code), IEC 60529:1989+AMD1:1999+AMD2:2013 CSV, edition 2.2. Paid standard, available from the IEC. Accessed 16 November 2026.
Incotech supplies connectors, backshells, contacts, crimp tooling, wire and cable, and builds custom cable assemblies for aerospace, defence, offshore, agricultural and industrial programmes. If you have a drawing whose references you are no longer sure about, send the callout block and we will tell you what has moved.